Publications

Links to the Private Libraries in ADS
1995 | 1994 | 1993 | 1992 | 1991 | 1990 | 1989 | 1988 | 1987
Back to Publications

Links to the Private Libraries in ADS

LBT Tech-Journals - (technical journal articles)
LBT Tech-Proceedings - (technical conference proceedings)

 
ADS & EIE 1995

ADS/EIE Pier Construction Procedures from the Foundations to the Setting of the Azimuth Ring
Rigato and Zanon (1/95)

ADS/EIE Optimization of the Pier
Rigato (2/95)

ADS/EIE Static Verifications on Pier Structure
Preliminary Rigato (2/95)

ADS/EIE New LBT FEA Model Pier:
Upper Slab Optimization
Conte and Rigato (2/95)

ADS/EIE Final Configuration of the M2-F15
Spider Pozzi (3/95)

ADS/EIE Technical Specifications of Driving Systems
Tomelleri (3/95)

ADS/EIE Technical Report of Supporting, Driving, and Measuring Systems
Tomelleri (3/95)

ADS/EIE Telescope Drawings (3/95)

ADS/EIE Technical Specifications of Rim Gear Wheels
Tomelleri (4/95)

ADS/EIE Technical Specifications of Support Systems
Tomelleri (4/95)

ADS/EIE Technical Specifications of Support Systems
Tomelleri (5/95)

ADS/EIE Description and Comments of Pier Drawings
Rigato (5/95)

ADS/EIE Technical Specification of the Measuring Heads, Manual Drive, Stow Pins, Limit Switches, Dampers and Rollshields
Tomelleri (5/95)

ADS/EIE Technical Specification of Driving Systems
Tomelleri (6/95)

ADS/EIE Technical Specification of Secondary and Tertiary Spiders with Rotation Mechanisms
Pozzi (6/95)

ADS/EIE C-Ring Track Optimization
(6/95)

ADS/EIE Azimuth Track Optimization
(6/95)

ADS/EIE M2/F4 Secondary Spider Rotation Mechanisms
(7/95)

ADS/EIE Static Verification on Pier Structure
Rigato (7/95)

ADS/EIE New LBT FEA Model
Pier: Upper Slab Optimization
Rigato (7/95)

ADS/EIE Technical Specification Pier/Upper Ring Steel Structure
Marchiori (10/95)

ADS/EIE Technical Specification Azimuth Track
Marchiori (10/95)

ADS/EIE First Complete FEA Model
Rigato (10/95)

ADS/EIE C-Ring Track Optimization
Rigato (10/95)

ADS/EIE Azimuth Track Optimization
Rigato (10/95)

ADS/EIE LBT Machining and Assembly Procedure
Rigato (10/95)

ADS/EIE LBT Windscreen System Preliminary Calculations
Merlo (10/95)

 
ADS & EIE 1994

ADS Working Drawings for last revision of LBT Structure
Gallieni (4/94)

ADS/EIE Preliminary Study of the LBT Foundation and Pier Structure
Rigato (5/94)

ADS Feasibility Study Completion
Buildings in the Final Site (Contract TE004 - 4 April 1994)
(7/94)

ADS/EIE Report on Optimization of the Pier Wind Deflections
Rigato (7/7/94)

ADS/EIE Report on Tracks, Fissaggi e Relativa Struttura di Supporto
e Centraggio del Telescopio LBT
Conte (7/8/94)

ADS Feasibility Study Completion
Buildings in the Final Site (Contract TE004)
Rev.1 (8/94)

ADS/EIE All Preliminary Drawings
(8/12/94)

ADS Feasibility Study Completion
Telescope (Contract E004)
(10/25/94) (Issue 2)

ADS/EIE Report on New LBT FEA Model Azimuth Frame Optimization
Conte (11/13/94)

ADS/EIE Report on New LBT FEA Model Pier: Upper Slab Optimization
Conte (11/13/94)

ADS/EIE Report on Telescope Design
(12/94)

ADS/EIE Report on M3 Spider
Gallieni (12/94)

ADS/EIE Report on M2-F15 Spider
Gallieni (12/94)

ADS/EIE Report on M2-F4 Spider
Gallieni (12/94)

ADS/EIE Presentation of Steel Structure Meeting in Arcetri (Florence)
(12/94)

 
ADS 1993

Columbus Project Drawings
(1/93)

Static and Dynamic FEA Analysis of the Telescope and Cantilever
Rotating Spiders Structure
(2/93)

Impact Analysis of the Pier in the Main System's Frequency
(2/93)

ADS Drawings of Building Layout and Location of Mirror Covers
4/93

Agenda for Spring '93 Arcetri Meeting
Telescope and Enclosure Design
(4/93)

 
ADS 1992

Telescope and Building Design Revision, July 92
Gallieni (9/92)

Design Revision, July 92: Additional Investigation
Gallieni (10/92)

"Hardpoint Design" in progress
Tomelleri (12/92)

 
ADS 1991

Telescope and Building Design Progress
Gallieni (1/91)

Washing and Aluminizing Equipment Storage
Gallieni (3/91)

Columbus Project: Dimensionamento Preliminare Edificio Girevole
(Rotating Building F. E. Analysis)
Gallieni (3/91)

Columbus Project - M1 Cell Detail Design
(9/91)

Conceptual Sketches of Piero's "Open Two Shooter..."
(12/91)

 
ADS 1990

Dynamic Analysis of Telescope Structure
Gatti (1/90)

Drawings of Enclosure
Gallieni (2/90)

Progress Report on Mechanical and Structural Design
Gallieni (5/90)

Rotating Building Functional Design
Gallieni (5/90 & 9/90) (Revision 3 11/90)

 
ADS 1989

Feasibility Study: Phase A
Gallieni (2-16-89)

Preliminary Study of Simulation and Control of the Elevation Axis
Gatti, Maver, Ronco (no date)

Simulazione Comportamento Struttura Di Elevazione per Piccoli
Cambiamenti Dell'Angolo Di Puntamento
(10/89)

Feasibility Study for Support Driving and Measuring Systems
Alt - Azimuth Telescope 2x8 m
Tomelleri (12/89)

Progress Report on Mechanical and Structural Design
Gallieni (12/89)

 
ADS 1988

Feasibility Studies of the Supports for the Optics and Handling
Problems in the Building
(8/88)

Columbus Project 2 x 8m F 1.2 Optical Telescope
Feasibility Study of the Elevation Structure Static and Dynamic Analysis

Majorana, Schrefler, Vigilante, A. Zaupa, F. Zaupa (SIGE)
(9-20-88)

 
ADS 1987

Preliminary Study of the Support, Drive, Measuring Systems
Gallieni, Villa (4/87)
Feasibility Study of the Support, Drive, Measuring Systems
(4/87)

Static and Dynamic Analyses of the Elevation Structure of a 2 x 8M Optical Telescope (Volumes I & II)
Majorana, Schrefler, Zavarise (4/13-15/87) (7-8-87)
(Istituto di Scienza e Tecnica delle Costruzioni - University of Padova)

Static and Dynamic Analyses of the Elevation Structure of a 2x8 m Optical Telescope (Second Upgrade Model)
Zavarise, Majorana, Schrefler (10/87)

Construction and Machining Problems and Costs Evaluation
(4/87)

Preliminary Considerations on the Influence in Telescope and Building Design of Various Handling and Storage Systems of Optics and Instruments
Gallieni (4/87)

Investigations on Alternative Structures for the Double Shooter Telescope
Angel (5-23-87)