Links to the Private Libraries in ADS
1995 |
1994 |
1993 |
1992 |
1991 |
1990 |
1989 |
1988 |
1987
Back to Publications
Links to the Private Libraries in ADS
LBT Tech-Journals - (technical journal articles)
LBT Tech-Proceedings - (technical conference proceedings)
ADS & EIE 1995
ADS/EIE Pier Construction Procedures from the Foundations to the Setting of the Azimuth Ring
Rigato and Zanon (1/95)
ADS/EIE Optimization of the Pier
Rigato (2/95)
ADS/EIE Static Verifications on Pier Structure
Preliminary Rigato (2/95)
ADS/EIE New LBT FEA Model Pier:
Upper Slab Optimization
Conte and Rigato (2/95)
ADS/EIE Final Configuration of the M2-F15
Spider Pozzi (3/95)
ADS/EIE Technical Specifications of Driving Systems
Tomelleri (3/95)
ADS/EIE Technical Report of Supporting, Driving, and Measuring Systems
Tomelleri (3/95)
ADS/EIE Telescope Drawings (3/95)
ADS/EIE Technical Specifications of Rim Gear Wheels
Tomelleri (4/95)
ADS/EIE Technical Specifications of Support Systems
Tomelleri (4/95)
ADS/EIE Technical Specifications of Support Systems
Tomelleri (5/95)
ADS/EIE Description and Comments of Pier Drawings
Rigato (5/95)
ADS/EIE Technical Specification of the Measuring Heads, Manual Drive,
Stow Pins, Limit Switches, Dampers and Rollshields
Tomelleri (5/95)
ADS/EIE Technical Specification of Driving Systems
Tomelleri (6/95)
ADS/EIE Technical Specification of Secondary and Tertiary Spiders with Rotation Mechanisms
Pozzi (6/95)
ADS/EIE C-Ring Track Optimization
(6/95)
ADS/EIE Azimuth Track Optimization
(6/95)
ADS/EIE M2/F4 Secondary Spider Rotation Mechanisms
(7/95)
ADS/EIE Static Verification on Pier Structure
Rigato (7/95)
ADS/EIE New LBT FEA Model
Pier: Upper Slab Optimization
Rigato (7/95)
ADS/EIE Technical Specification Pier/Upper Ring Steel Structure
Marchiori (10/95)
ADS/EIE Technical Specification Azimuth Track
Marchiori (10/95)
ADS/EIE First Complete FEA Model
Rigato (10/95)
ADS/EIE C-Ring Track Optimization
Rigato (10/95)
ADS/EIE Azimuth Track Optimization
Rigato (10/95)
ADS/EIE LBT Machining and Assembly Procedure
Rigato (10/95)
ADS/EIE LBT Windscreen System Preliminary Calculations
Merlo (10/95)
ADS & EIE 1994
ADS Working Drawings for last revision of LBT Structure
Gallieni (4/94)
ADS/EIE Preliminary Study of the LBT Foundation and Pier Structure
Rigato (5/94)
ADS Feasibility Study Completion
Buildings in the Final Site (Contract TE004 - 4 April 1994)
(7/94)
ADS/EIE Report on Optimization of the Pier Wind Deflections
Rigato (7/7/94)
ADS/EIE Report on Tracks, Fissaggi e Relativa Struttura di Supporto
e Centraggio del Telescopio LBT
Conte (7/8/94)
ADS Feasibility Study Completion
Buildings in the Final Site (Contract TE004)
Rev.1 (8/94)
ADS/EIE All Preliminary Drawings
(8/12/94)
ADS Feasibility Study Completion
Telescope (Contract E004)
(10/25/94) (Issue 2)
ADS/EIE Report on New LBT FEA Model Azimuth Frame Optimization
Conte (11/13/94)
ADS/EIE Report on New LBT FEA Model Pier: Upper Slab Optimization
Conte (11/13/94)
ADS/EIE Report on Telescope Design
(12/94)
ADS/EIE Report on M3 Spider
Gallieni (12/94)
ADS/EIE Report on M2-F15 Spider
Gallieni (12/94)
ADS/EIE Report on M2-F4 Spider
Gallieni (12/94)
ADS/EIE Presentation of Steel Structure Meeting in Arcetri (Florence)
(12/94)
ADS 1993
Columbus Project Drawings
(1/93)
Static and Dynamic FEA Analysis of the Telescope and Cantilever
Rotating Spiders Structure
(2/93)
Impact Analysis of the Pier in the Main System's Frequency
(2/93)
ADS Drawings of Building Layout and Location of Mirror Covers
4/93
Agenda for Spring '93 Arcetri Meeting
Telescope and Enclosure Design
(4/93)
ADS 1992
Telescope and Building Design Revision, July 92
Gallieni (9/92)
Design Revision, July 92: Additional Investigation
Gallieni (10/92)
"Hardpoint Design" in progress
Tomelleri (12/92)
ADS 1991
Telescope and Building Design Progress
Gallieni (1/91)
Washing and Aluminizing Equipment Storage
Gallieni (3/91)
Columbus Project: Dimensionamento Preliminare Edificio Girevole
(Rotating Building F. E. Analysis)
Gallieni (3/91)
Columbus Project - M1 Cell Detail Design
(9/91)
Conceptual Sketches of Piero's "Open Two Shooter..."
(12/91)
ADS 1990
Dynamic Analysis of Telescope Structure
Gatti (1/90)
Drawings of Enclosure
Gallieni (2/90)
Progress Report on Mechanical and Structural Design
Gallieni (5/90)
Rotating Building Functional Design
Gallieni (5/90 & 9/90) (Revision 3 11/90)
ADS 1989
Feasibility Study: Phase A
Gallieni (2-16-89)
Preliminary Study of Simulation and Control of the Elevation Axis
Gatti, Maver, Ronco (no date)
Simulazione Comportamento Struttura Di Elevazione per Piccoli
Cambiamenti Dell'Angolo Di Puntamento
(10/89)
Feasibility Study for Support Driving and Measuring Systems
Alt - Azimuth Telescope 2x8 m
Tomelleri (12/89)
Progress Report on Mechanical and Structural Design
Gallieni (12/89)
ADS 1988
Feasibility Studies of the Supports for the Optics and Handling
Problems in the Building
(8/88)
Columbus Project 2 x 8m F 1.2 Optical Telescope
Feasibility Study of the Elevation Structure Static and Dynamic Analysis
Majorana, Schrefler, Vigilante, A. Zaupa, F. Zaupa (SIGE)
(9-20-88)
ADS 1987
Preliminary Study of the Support, Drive, Measuring Systems
Gallieni, Villa (4/87)
Feasibility Study of the Support, Drive, Measuring Systems
(4/87)
Static and Dynamic Analyses of the Elevation Structure of a
2 x 8M Optical Telescope (Volumes I & II)
Majorana, Schrefler, Zavarise (4/13-15/87) (7-8-87)
(Istituto di Scienza e Tecnica delle Costruzioni - University of Padova)
Static and Dynamic Analyses of the Elevation Structure of a
2x8 m Optical Telescope (Second Upgrade Model)
Zavarise, Majorana, Schrefler (10/87)
Construction and Machining Problems and Costs Evaluation
(4/87)
Preliminary Considerations on the Influence in Telescope and
Building Design of Various Handling and Storage Systems of
Optics and Instruments
Gallieni (4/87)
Investigations on Alternative Structures for the Double Shooter Telescope
Angel (5-23-87)